Marathon Marina and Resort,
Marathon , FL
Kelly Brothers was contracted by Bellingham Marine to design / build a new 8’ x 100’ fixed concrete pier and 5’ x 20’ concrete finger pier as part of the renovation project for Marathon Marina. Included in KBI’s scope was the demolition of the existing concrete pier, fuel platform and office building. KBI also drove 38 steel anchor pipe piles with HDPE sleeves for the concrete floating dock system.
Location:
1021 11th Street Ocean
Marathon, FL
Owner:
Marathon Marina and Resort
Engineer:
Coastal Engineering Consultants
3106 Horseshoe Dr. S.
Naples, FL 34104
Contract:
Subcontract
Prime Contractor:
Bellingham Marine
1813 Dennis Street
Jacksonville, FL 32204
Date Completed:
August 2016