Marina - Cape Coral

Tarpon Point, Cape Coral, FL

Phase I – Kelly Brothers was contracted by Bellingham Marine, the design-build contractor, to assemble and install over 7,800 sq. ft. of concrete Unifloats® in the 1st phase of this marina’s planned expansion. The work included piles, pile driving, pile caps walers, cleats, fendering, gangways, and a 2,000+ sq. ft. fixed public access pier.

Location:
5850 Silver King Blvd.
Cape Coral, FL

Owner:
Freeman & Hasselwander
Resort Properties, LLC

Engineer:
Bellingham Marine
1813 Dennis Street
Jacksonville, FL 32204

Contract:
Subcontract

Prime Contractor:
Bellingham Marine
1813 Dennis Street
Jacksonville, FL 32204

Date Completed:
January 25, 2015

Tarpon Point, Cape Coral, FL

Phase II – Kelly Brothers was contracted to continue work from Phase I by expanding the fixed dock area an additional 4,450 sq. ft. by means of heavy timber framing and Tandeck composite decking and hand rails. The project also included the installation of 6,500 sq. ft. of Bellingham concrete floating dock with concrete pilings measuring up to 18” x 50’. The entire floating dock was finished and trimmed with composite decking and fascia.

Location:
5850 Silver King Blvd.
Cape Coral, FL

Owner:
Freeman and Hasselwander
Resort Properties LLC

Engineer:
Coastal Engineering Consultants
3106 S Horseshoe Drive
Naples, FL 34104

Contract:
Subcontract

Prime Contractor:
Kybro Contracting Group, Inc.
4637 Vincennes Blvd., Suite 2
Cape Coral, 33904

Date Completed:
October 2016

Final Contract Amount:
$486,419.00

Photo Gallery

What our Clients are Saying

During construction Kelly Brothers proved their expertise in marine construction by value engineering various components of our multi-faceted project, which resulted in a considerable cost savings to the City of Naples. They have a knowledgeable staff with a strong work ethic and the specialized equipment to deliver a quality product at a competitive price.

~ Roger Jacobsen, Harbor Master
City Dock, Naples

What our Clients are Saying

Kelly Brother’s commitment to customer satisfaction, quality work, and on budget performance was proven at every level and every project. The result of our working together has been building one of the area’s premier marinas and recently garnered National Marina of the Year. We certainly consider their work as an integral part of this achievement!

~ Sam Chavers, Vice President
Marina Jack, Sarasota

What our Clients are Saying

Congratulations to the team for a great project. The KBI crew was outstanding. It is rare that a crew completes a dredge project without the need for a punch list at the end.  Thanks to Jake, Travis, and especially to Raul and his crew.

~ Mark Kincaid P.E., Vice President of Engineering
Coastal Engineering Consultants

What our Clients are Saying

Kelly Brothers was commissioned to construct a meandering 1,200 lineal foot elevated boardwalk, through our environmentally sensitive wetland. Our goal was to construct an elevated boardwalk and shell paths through this coastal habitat while respecting the mangrove forest, salt marsh, as well as the oak hammock uplands. The chorography technique Kelly Brothers created was truly impressive. As a result, there was no disturbance or destruction to any part of the surrounding area.

~ Al Meronek, Project Manager
Neal Preserve, Bradenton, Manatee County

What our Clients are Saying

KBI was very cooperative in developing solutions to an unforeseen subsurface condition that occurred during installation of the piling. They negotiated the extra
work compensation fairly, and they proceeded with the work with no delays to the project.

~ Todd Boehmer, Amec Foster Wheeler, Project Engineer
Arcadia Bridge, Arcadia