Tarpon Point, Cape Coral, FL
Phase I – Kelly Brothers was contracted by Bellingham Marine, the design-build contractor, to assemble and install over 7,800 sq. ft. of concrete Unifloats® in the 1st phase of this marina’s planned expansion. The work included piles, pile driving, pile caps walers, cleats, fendering, gangways, and a 2,000+ sq. ft. fixed public access pier.
Location:
5850 Silver King Blvd.
Cape Coral, FL
Owner:
Freeman & Hasselwander
Resort Properties, LLC
Engineer:
Bellingham Marine
1813 Dennis Street
Jacksonville, FL 32204
Contract:
Subcontract
Prime Contractor:
Bellingham Marine
1813 Dennis Street
Jacksonville, FL 32204
Date Completed:
January 25, 2015
Tarpon Point, Cape Coral, FL
Phase II – Kelly Brothers was contracted to continue work from Phase I by expanding the fixed dock area an additional 4,450 sq. ft. by means of heavy timber framing and Tandeck composite decking and hand rails. The project also included the installation of 6,500 sq. ft. of Bellingham concrete floating dock with concrete pilings measuring up to 18” x 50’. The entire floating dock was finished and trimmed with composite decking and fascia.
Location:
5850 Silver King Blvd.
Cape Coral, FL
Owner:
Freeman and Hasselwander
Resort Properties LLC
Engineer:
Coastal Engineering Consultants
3106 S Horseshoe Drive
Naples, FL 34104
Contract:
Subcontract
Prime Contractor:
Kybro Contracting Group, Inc.
4637 Vincennes Blvd., Suite 2
Cape Coral, 33904
Date Completed:
October 2016
Final Contract Amount:
$486,419.00