Dock - Naples

City Dock, Naples, FL

KBI recently completed work on the prestigious Naples’ City Dock reconstruction. The work consisted of dredging, demolition/disposal of 19,490 sq. ft. existing wooden fixed docks, overwater buildings, and fend off piles. Along with demo, work included the installation of 21,262 sq. ft. of new concrete floating docks, installation of 3,571 sq. ft. of heavy timber & IPE fixed docks, reconstruction of three overwater/floating buildings, design-build fuel system, and all utilities (fire, water, electric and waste). Dock boxes, signage and fish cleaning stations were provided as part of the finishing touches for this new and improved docking facility for the City of Naples. KBI worked in conjunction with the City of Naples utilizing the City’s direct purchase program to generate a sales tax savings for the project. This multi-million dollar project was completed on time and under budget.

Location:
735 8th Street South
Naples, FL

Owner:
City of Naples

Engineer:
Turrell, Hall & Associates, Inc.
3584 Exchange Avenue
Suite B
Naples, FL 34104-3732

Contract:
Prime

Date Completed:
February 2018

Photo Gallery

What our Clients are Saying

Kelly Brother’s commitment to customer satisfaction, quality work, and on budget performance was proven at every level and every project. The result of our working together has been building one of the area’s premier marinas and recently garnered National Marina of the Year. We certainly consider their work as an integral part of this achievement!

~ Sam Chavers, Vice President
Marina Jack, Sarasota

What our Clients are Saying

During construction Kelly Brothers proved their expertise in marine construction by value engineering various components of our multi-faceted project, which resulted in a considerable cost savings to the City of Naples. They have a knowledgeable staff with a strong work ethic and the specialized equipment to deliver a quality product at a competitive price.

~ Roger Jacobsen, Harbor Master
City Dock, Naples

What our Clients are Saying

KBI was very cooperative in developing solutions to an unforeseen subsurface condition that occurred during installation of the piling. They negotiated the extra
work compensation fairly, and they proceeded with the work with no delays to the project.

~ Todd Boehmer, Amec Foster Wheeler, Project Engineer
Arcadia Bridge, Arcadia

What our Clients are Saying

Kelly Brothers was commissioned to construct a meandering 1,200 lineal foot elevated boardwalk, through our environmentally sensitive wetland. Our goal was to construct an elevated boardwalk and shell paths through this coastal habitat while respecting the mangrove forest, salt marsh, as well as the oak hammock uplands. The chorography technique Kelly Brothers created was truly impressive. As a result, there was no disturbance or destruction to any part of the surrounding area.

~ Al Meronek, Project Manager
Neal Preserve, Bradenton, Manatee County

What our Clients are Saying

Congratulations to the team for a great project. The KBI crew was outstanding. It is rare that a crew completes a dredge project without the need for a punch list at the end.  Thanks to Jake, Travis, and especially to Raul and his crew.

~ Mark Kincaid P.E., Vice President of Engineering
Coastal Engineering Consultants