Fort Charles Holding, Naples, FL
Kelly Brothers, Inc. (KBI) was contracted to install an 880 sq. ft. concrete floating dock with steel pipe pile, HDPE sleeves, and aluminum gangway. The Category 4 Hurricane Rated floating dock was secured in place utilizing nine 12.75” OD x 60’ steel pipe pile which were driven into a subterranean layer of rock via KBI’s 7-ton rock punch. Piles were set in place utilizing KBI’s barge/crane and a vibrator hammer. HDPE sleeves were placed over the pipe to prevent corrosion and to provide an aesthetically pleasing look. Two 12.75” OD x 40’ steel mooring pile with HDPE sleeves were also installed flanking the dock. Once the dock was secured, the 6’ x 26’ aluminum gangway was fastened in place; then plumbing and electrical were installed. Flush mount LED surface lights were installed along with two lighted power pedestals. Dock accessories including two large dock boxes, two composite benches, and a custom fish cleaning station were also provided and installed by KBI. Construction took approximately 3.5 weeks to complete.
Location:
3220 Fort Charles Dr.
Naples, FL 34102
Owner:
Fort Charles Holdings, LLC
Engineer:
Turrell, Hall & Associates, Inc.
3584 Exchange Avenue
Suite B
Naples, FL 34104-3732
Contract:
Prime
Date Completed:
May 2019