Arcadia Bridge FDOT, Arcadia, FL
Kelly Brothers was contracted to install 1,700 LF of pre-stressed concrete pile in the construction of the bridge of Joshua Creek. KBI also is responsible to pre-form 765 LF of pile holes, form and pour 540 CY of concrete, place 100,000 LB of reinforcement steel, and form and pour 511 LF of 32” F-slope traffic rail.
Location:
SR 35 (US17)
Bridge over Joshua Creek
Arcadia, FL
Owner:
Florida Department of Transportation (FDOT)
Architect:
Dewberry Bowyer Singleton
520 S Magnolia Avenue
Orlando, FL 32801
Contract:
Subcontract
Prime Contractor:
Conalvias USA, LLC.
1001 Cypress Creek Road
Suite 200
Fort Lauderdale, FL 33309
Date Completed:
July 2017